Skip to content
Own network: freeWork with your own signmakers now, in every region. Matching opens region by region once there are enough signmakers. Sign up now and you are in from the moment your region opens.What you can do now
Own network: freeRegions are filling up

Hire a stand builder to build and dismantle exhibition stands

A self-employed stand builder builds and dismantles exhibition stands, fabric frames and system stands. In most cases, expect €40 to €55 per hour. On Signborn you work with self-employed stand builders and signmakers. Handy for stand builders, sign companies and agencies with a peak in trade-fair season.

Start free

No subscription needed. You can start with your own signmakers today, in any region.

New jobExample

Hire a stand builder

Requested

Trade show stand / fabric frame assemblyFrame and construction assemblyRoll-up banner installation

Where stand building gets stuck

  • Three trade fairs in the same week, and your regular build crew can only be in one place at a time.
  • A build-up window that ends at six, and a frame that doesn't fit.
  • Fabric graphics full of creases, because nobody has experience with silicone edges.
  • Dismantling on a Sunday evening and nobody available.

A stand builder through Signborn

  • Built for stand buildingExhibition stand and fabric frame, frames and structures, roll-ups and floor graphics are separate skills.
  • Your own network for the busy seasonInvite your regular build crew and plan them in per fair. You'll find new signmakers by region as soon as matching opens there.
  • Own rate, visible upfrontThe stand builder sets their own rate. You see the total including the Signborn fee and VAT before you confirm.
  • Handover on recordPhotos of the finished stand with time and location, plus a signature from your contact person.

Types of work

  • Trade show stand / fabric frame assembly
  • Frame and construction assembly
  • Roll-up banner installation
  • Apply Airtex / photo wallpaper
  • Floor sticker
  • Interior lettering and wall graphics
  • Apply full-colour prints
  • Removing old signage (stripping vinyl, dismantling)
  1. What a self-employed stand builder does

    • Building and dismantling system stands made of aluminium profiles.
    • Stretching fabric frames with printed silicone-edge graphics.
    • Covering walls with vinyl or Airtex, applying floor graphics and fitting lettering.
    • Setting up counters, displays, lighting and roll-ups.
    • Dismantling, packing and loading for transport or storage.
  2. Working within exhibition hours

    Exhibition centres work with fixed build-up and dismantling times, access rules and sometimes a compulsory safety briefing. Build-up often starts one or two days before opening. Dismantling starts straight after closing and sometimes goes on into the night. Put the exact times, the hall and the stand number in your job, and sort out access passes in advance. The stand builder plans their own work within those times. You agree on the result.

  3. Fabric frames and system stands

    With fabric frames, it's all about a taut graphic without creases: the silicone edge has to sit evenly in the groove and the fabric needs to be at the right temperature. System stands need a good drawing with dimensions and a logical build order, so lighting and cabling are in the profiles in time. In your job, ask for experience with the system you use.

  4. A good stand-building brief

    • Fair, hall, stand number and the exact build-up and dismantling times.
    • Stand drawing with dimensions, and the system or frame type.
    • What's going along: fabrics, vinyl, counters, lighting, flooring.
    • Who arranges transport and where the materials will be ready.
    • Contact person at the fair and who signs off the handover.
    • Whether dismantling, packing or storage is needed as well.
  5. Self-employed means self-employed

    A self-employed stand builder isn't an extra employee for the week. They work under their own name, with their own tools, their own insurance and their own rate, and can turn a job down. You agree on the result: a finished stand at the agreed time. Rosters, your company workwear or a fixed crew schedule don't fit with a self-employed professional under the Dutch DBA Act (Wet DBA).

  6. Planning for trade-fair season

    Spring and autumn are the busy trade-fair months. Good build crews are booked up weeks in advance. Invite your regular people in good time and post the job as soon as the stand drawing and the times are known. A small system stand is often up within half a day. A large custom stand with lighting and flooring takes several days and several pairs of hands. Plan dismantling and transport as carefully as the build-up: after closing, every hour counts.

  7. Outsourcing stand building or hiring stand builders

    Outsourcing stand building means a stand building company does the whole project: design, production, transport and build-up. Hiring stand builders is something else. You already have the stand and you are looking for self-employed people for build-up and breakdown on the exhibition floor.

    Signborn is for the second. You describe the result, the exhibition and the times, and self-employed stand builders respond with their own rate.

How does Signborn work?

From job to invoice, in five steps.

  1. Describe it once

    Address, date, sizes and what needs doing. You choose who sees it: everyone who fits, or only your own network.

    New jobExample

    Window lettering

    • Prinsestraat 41, The Hague
    • Thu 3 Dec · 07:30
    • 1200 × 300 mm · cut vinyl

    Who sees this job?

    • Everyone who fitsSignmakers on Signborn who match on trade, region and availability
    • Only my networkOnly people you invited yourself
  2. You see who wants it

    Signmakers who fit by trade, certificates, region and calendar see your job and say yes or no. Saying no has no consequences.

  3. You choose who shows up

    Compare the responses, with your own network at the top, and choose one or more signmakers. Then the chat opens. With more than one signmaker, it's a single group chat.

  4. You see how it was handed over

    GPS check-in on site, handover with photos and location. You approve within 48 hours, or raise an objection.

    HandoverExample

    Job sheet: 3 of 3 done

    All done as briefed

    Before
    During
    Done
    • On site07:24–11:38
    • Signed off by your client11:41
    Approve within 48 hoursBy Sat 5 Dec at 11:42
    • Job sheet for your own client: no amounts, in your own branding.
  5. The invoice is ready

    The signmaker invoices you directly, pre-filled from the job, and you pay within 14 or 30 days. Signborn sends a separate fee invoice. No money runs through Signborn.

The five best-matching signmakers get a notification, ranked on seven factors with fixed weights. Matching with new signmakers opens region by region. Until then, your job goes to your own network.

New jobExample

Window lettering

  • Prinsestraat 41, The Hague
  • Thu 3 Dec · 07:30
  • 1200 × 300 mm · cut vinyl

Who sees this job?

  • Everyone who fitsSignmakers on Signborn who match on trade, region and availability
  • Only my networkOnly people you invited yourself
HandoverExample

Job sheet: 3 of 3 done

All done as briefed

Before
During
Done
  • On site07:24–11:38
  • Signed off by your client11:41
Approve within 48 hoursBy Sat 5 Dec at 11:42
  • Job sheet for your own client: no amounts, in your own branding.

Frequently asked questions about stand building

What does it cost to hire a stand builder?

The stand builder sets their own rate, per hour or per job. Night and weekend work and travel time can come on top. As the client you also pay the Signborn fee through Signborn: 8% for a match, minimum €15 and maximum €300 per signmaker per job. With your own network there is no fee.

Can I hire several stand builders for one fair?

Yes. One job can ask for several signmakers. Each one enters into their own contract for services with you and sends their own invoice.

Does Signborn also design or produce exhibition stands?

No. Signborn connects clients with self-employed signmakers for the work on site. You arrange design, production and transport yourself or with your own suppliers.

Does a stand builder need VCA?

That depends on the fair or venue. Some exhibition centres require a safety briefing or VCA for build-up. Ask for the certificate in your job if the venue requires it.

Do stand builders also work nights and weekends?

Many do, because dismantling often starts straight after closing. Put the times in your job. The stand builder only responds if they're available.

Who signs off the handover at the fair?

Your contact person or the exhibitor signs digitally at handover. You'll find that in your dashboard, together with the photos showing time and location.

What is the difference between a stand builder and a stand building company?

A stand building company designs and produces stands and takes on the whole project. A self-employed stand builder builds up and breaks down, usually for such a company or for an agency. Through Signborn you find self-employed stand builders, not stand building companies.

Trade fair coming up?

Post your stand-building job for free. You can invite your own build crew today.